Task 274: Communications Report External Review
完了 ← タスク一覧
Task 274: Communications Report External Review
Status: DONE
Motivation
Summary report external reviews are in progress. ship-kestrel (T266) and cross-episode (T273) are done; 7 remain. The communications report (通信遅延と通信描写の考証) covers light-speed delay analysis across all 5 episodes — a key scientific analysis that benefits from external review.
Scope
- Launch an external review agent (separate context) to review the communications report
- Fix any issues found (data inconsistencies, readability problems, broken links)
- Add regression tests for any corrections
Review Criteria
- Data integrity: distances, light-speed delays, and calculations are consistent
- Japanese text quality: natural phrasing, no awkward constructions
- Navigation: links work, cross-references are valid
- Readability: accessible to readers unfamiliar with SOLAR LINE
- Source citations: properly linked and accurate
Issues Found and Fixed
External review (Sonnet agent) found 11 issues:
- HIGH: DSOC 267 Mbps was at ~0.2 AU, not 1.8 AU — corrected with NASA source link
- HIGH: EP03 route distance 10.1–12.8 AU outdated — corrected to 9.6 AU (new epoch)
- MEDIUM: FSPL optical 363 dB → 362 dB (verified by calculation)
- MEDIUM: EP01 所見 Earth delay 47 min → 52 min (consistent with 全話通貫 table)
- LOW: Route table EP01 Earth delay 4.4 → 4.3 min
- MEDIUM: Added EP02 beacon discovery/timing scenes (ep02-dl-028, dl-050, dl-051)
- MEDIUM: Added EP05 beacon blackout and deception beacon scenes
- LOW: Added timestamp to EP02 communication quote (18:01)
- MEDIUM: Clarified route table column headers with explanatory note
- MEDIUM: Added introduction section (本レポートについて) for newcomers
- LOW: EP04 section text clarified (no external comm scenes)
+6 regression tests (DSOC distance, EP03 distance, FSPL, beacon timing, blackout/deception, intro)