Task 466: Add Charts to Communications Summary Report
完了 ← タスク一覧
Task 466: Add Charts to Communications Summary Report
Status: DONE
Summary
The communications summary report has only 1 bar chart + 1 timeseries — far fewer than other summaries like cross-episode (6 charts). Add 2 charts:
- Beacon reliability degradation (EP01→EP05): Progressive failure from 100% → 99.8% → degraded → 0% (UNAVAILABLE). Shows the escalating navigation crisis across the series.
- FSOC data rate vs distance: DSOC at 0.2 AU (267 Mbps) vs 1.5 AU (25 Mbps) vs deep-space scaling. Demonstrates why optical comms technology featured in the series is realistic.
Plan
- Write content validation tests (TDD red)
- Add 2 bar charts to communications.md
- Verify tests pass (TDD green)
- Commit
Impact
- Brings communications.md from 2 to 4 visualizations
- Makes the beacon degradation narrative visually compelling
- Follows "more figures are better than fewer"