⚠ ネタバレ注意: 本サイトはSFアニメ「SOLAR LINE」の内容を詳細に分析しています。未視聴の方はご注意ください。
📝 AI生成コンテンツ: 本考証の大部分は AI(Claude Code 等)によって生成されています。内容の正確性については原作および引用元をご確認ください。

Task 466: Add Charts to Communications Summary Report

完了 ← タスク一覧

Task 466: Add Charts to Communications Summary Report

Status: DONE

Summary

The communications summary report has only 1 bar chart + 1 timeseries — far fewer than other summaries like cross-episode (6 charts). Add 2 charts:

  1. Beacon reliability degradation (EP01→EP05): Progressive failure from 100% → 99.8% → degraded → 0% (UNAVAILABLE). Shows the escalating navigation crisis across the series.
  2. FSOC data rate vs distance: DSOC at 0.2 AU (267 Mbps) vs 1.5 AU (25 Mbps) vs deep-space scaling. Demonstrates why optical comms technology featured in the series is realistic.

Plan

  1. Write content validation tests (TDD red)
  2. Add 2 bar charts to communications.md
  3. Verify tests pass (TDD green)
  4. Commit

Impact