Task 473: Add Enceladus Station Staffing Collapse Chart to Infrastructure Report
完了 ← タスク一覧
Task 473: Add Enceladus Station Staffing Collapse Chart to Infrastructure Report
Status: DONE
Summary
The infrastructure.md report has 2 bar charts. The most impactful missing visualization is the Enceladus Station staffing collapse: ~300 staff (peak) → 1 person (current). This 300:1 ratio powerfully illustrates the outer-sphere infrastructure decay theme.
Plan
- Write content validation test (TDD red)
- Add bar chart to infrastructure.md after the 外苑の特徴 section
- Verify test passes (TDD green)
- Commit
Impact
- Brings infrastructure.md from 2 to 3 bar charts
- Visualizes the central theme of outer-sphere institutional collapse